Our Approach
Supplier warehouse to field installation
A third-party, unbiased and transparent materials management cycle — engaged as early as possible.
- 1
Plan
BOM built from IFC drawings, models and P&IDs; long-lead items flagged; procurement and contract strategy set.
- 2
Procure
Vendor and contractor obligations defined; QSRs, RFIs and logistics tracked to site.
- 3
Receive
Materials received against the PO by barcode, RFID and GPS, with OS&D and NCRs logged, preservation started and records kept.
- 4
Package
EWPs, CWPs and FIWPs built so materials line up with the work before crews mobilize.
- 5
Issue & Close
Withdrawal recommendations driven by the schedule and progress, tracked through to turnover.
FAQ
Common questions
Deployment
Anywhere your project is located. On site we need an internet connection (client network, public, satellite or cellular), stable power, and office space with printing and scanning. Our systems are web-based, so there is no software to install on your network.
Personnel can typically mobilize within 7 to 10 days of agreement. For the best results, engage us as early as possible, ideally during detailed engineering. That lets us build the BOM, flag long-lead items and shape the procurement and contract strategy before material starts moving.
Technology
My Project World is an AI-powered project platform. Uplands works as a partner with its developers to build materials management into a platform that runs from project concept through engineering, procurement, scheduling, project controls, delivery, installation and turnover. Every material is tied to the schedule, the work pack and actual progress.
Barcodes handle item-level receiving and issuing. RFID tags allow fast, automated reads and vehicle-mounted sweeps of laydown yards. GPS records where each item sits. All three feed My Project World, where its AI smart technology links material status to the schedule, so you always know what you have, where it is and when it is needed.
Materials Management
The BOM is generated directly from IFC drawings, 3D models and P&IDs. It is then kept current using vendor-supplied BOMs, packing lists and as-built drawings, so the record matches what was actually bought, received and installed.
Material withdrawal recommendations are based on the construction schedule and actual field progress, and aligned to EWPs, CWPs and FIWPs. Readiness reviews confirm the materials are on hand before crews mobilize, so contractors can work uninterrupted.
QA/QC
Over, short and damaged material is recorded at receipt with a clear material status, and the vendor is notified right away. We target resolution within 24 to 48 hours. NCRs are tracked through to close-out, and every step leaves an audit trail that supports PO payment.
Preservation programs are developed using My Project World's AI smart technology to OEM requirements. Every activity is recorded, so the program is auditable, traceable and reportable, proving the required work was performed from receipt through to startup.
Vendor and Contractor Integration
Vendor obligations such as tagging, packing lists and documentation are defined up front. Vendor BOMs and packing lists load into My Project World, and Quality Surveillance Reports (QSRs), expediting and shipments are tracked to site, giving every stakeholder the same view of what is coming and when.
Contractors request material by EWP, CWA, FIWP, isometric, PO, equipment or tag number. Requests are checked against what is on hand and scheduled. RFIs and material issues are logged and tracked, so problems that could lead to claims or change orders surface early.
Get materials into the field — on time.
Tell us about your project and we'll show you where the pain points are before they become claims.